2023-013 West End Sidewalk Repairs, Project
The approximate principal materials and quantities are as follows: 4” Concrete Sidewalk – 750 SY, 6” Concrete Paving (Driveways) – 45 SY, 18”Concrerte Curb & Gutter – 130 LF, ADA Curb Ramps – 3 Each (all work will be within a couple of blocks of Hemphill Elementary School)
DIGITAL DOWNLOAD Complete Set
(click to expand/collapse)
***** This section is for the purchase of Digital files. Once the order is received and verified a download link will be provided, in a separate email. Plans are located withiin the spec book*****
Name | Size | ||
0001-Curb Ramp Detail | 835.6 KB | ||
0002-Standard Sidewalk Details | 551.9 KB | ||
0003-Street Detail | 598.8 KB | ||
Bid Document West End Sidewalk Repairs | 1.0 MB |
HARD COPY Complete Set
(click to expand/collapse)
*****This section is for Complete HARDCOPY printing ONLY. Plans are located within the spec book*****
Name | Size | ||
0001-Curb Ramp Detail | 835.6 KB | ||
0002-Standard Sidewalk Details | 551.9 KB | ||
0003-Street Detail | 598.8 KB | ||
Bid Document West End Sidewalk Repairs | 1.0 MB |