2023-013 West End Sidewalk Repairs, Project
The approximate principal materials and quantities are as follows: 4” Concrete Sidewalk – 750 SY, 6” Concrete Paving (Driveways) – 45 SY, 18”Concrerte Curb & Gutter – 130 LF, ADA Curb Ramps – 3 Each (all work will be within a couple of blocks of Hemphill Elementary School)
Addendum 1
(click to expand/collapse)
Name | Size | ||
Addendum1-Specs | 449.2 KB |