2023-013 West End Sidewalk Repairs, Project

The approximate principal materials and quantities are as follows: 4” Concrete Sidewalk – 750 SY, 6” Concrete Paving (Driveways) – 45 SY, 18”Concrerte Curb & Gutter – 130 LF, ADA Curb Ramps – 3 Each (all work will be within a couple of blocks of Hemphill Elementary School)
Date Company Contact
1692623853
8/21/23 1:17 pm
BCIA Birmingham Construction Industry Authority 601 37th Street South
Birmingham, AL 35222
Ashley Orl
Tel: (205) 324-6202
Fax: (205) 324-6210
1693301594
8/29/23 9:33 am
C P Construction S-Corporation 905 24th St. SW
Birmingham, AL 35211
Barbara Williams
Tel: (205) 515-0866
1693226212
8/28/23 12:36 pm
Constructconnect 3825 Edwards Rd.
Suite 800
Cincinnati, OH 45209
Plan Acquisition
Content
Tel: (513) 458-5978
Fax: (513) 458-5978
1694422315
9/11/23 8:51 am
Dodge Construction Network 2860 South State Highway 161
Suite 160 #501
Grand Prairie, TX 75052-7361
Jayalakshmi L
Other
Tel: (413) 376-7032
Fax: (733) 553-6621
1694089212
9/7/23 12:20 pm
Gillespie Construction, LLC 3304 3rd Ave S
Jasper, AL 35501
Erin Henson
HR Manager
Tel: (205) 295-5263
Fax: (205) 295-5363
1693914406
9/5/23 11:46 am
Global Management Group P.O. Box 19731
Birmingham, AL 35219
Mary Rugano
Tel: (205) 261-1163
1692885313
8/24/23 1:55 pm
Southeastern Sealcoating 1330 Adamsville Industrial Parkway
Birmingham, AL 35224
David Henderson
Tel: (205) 798-9560
Fax: (205) 798-9065